Case Studies

Real projects, real machines, real results. See how Idee equipment performs in the field.

🏳
Nairobi Expressway, Kenya

6 Excavators & 4 Loaders for Major Highway Project

A complete fleet of 10 machines was delivered within 45 days of order. The IDE-215 excavators and IDE-WL50 loaders supported 24-month continuous operation, each clocking 3,000+ hours with zero major breakdowns. Local operator training provided on-site.

3,000+ hrs
Per Unit Runtime
24 months
Project Duration
0
Major Breakdowns
Atacama Copper Mine, Chile

50-Ton Excavators for High-Altitude Mining

Three IDE-500 mining excavators deployed at 4,200m altitude in the Andes. Special high-altitude engine tuning, reinforced undercarriage, and cold-weather hydraulic fluid packages. Achieved 99.2% uptime over the first 12 months.

4,200m
Operating Altitude
99.2%
Uptime Rate
3 units
IDE-500 Deployed
🌉
Jakarta Port Terminal, Indonesia

Crawler Cranes for Maritime Infrastructure

Two IDE-CC100 crawler cranes supplied for a 14-month port terminal construction. 100T lifting capacity with 52m main boom. On-site rigging and operator training included. Zero safety incidents throughout the project.

100T
Lift Capacity
14 months
Project Duration
0
Safety Incidents
🏗
Trans-Amazon Highway, Brazil

Bulldozer Fleet for Rainforest Road Construction

Five IDE-D220 bulldozers deployed on a 180km highway through dense Amazon terrain. Reinforced radiator guards, forestry-spec undercarriage, and tropical cooling packages ensured reliable operation in extreme humidity and mud.

180km
Highway Built
5 units
D220 Deployed
18 months
Non-Stop Operation
🏛
Dubai Desert City, UAE

Wheel Loaders for Mega Construction Site

Eight IDE-WL80 wheel loaders operating in 50-degree Celsius desert heat. Sand-proof air filtration, high-ambient cooling, and dust-sealed joints kept machines running at 97% uptime over two summer seasons.

50°C
Max Ambient Temp
97%
Summer Uptime
8 units
WL80 Deployed
🇹🇪
Lagos-Ibadan Railway, Nigeria

Road Rollers & Excavators for Rail Infrastructure

Combined fleet of 4 IDE-RR26 rollers and 3 IDE-350 excavators for railway embankment and subgrade compaction. All units completed the 156km rail line on schedule in challenging laterite soil conditions.

156km
Rail Line Built
7 units
Total Fleet
On Time
Project Delivery